Bowie County
- I-30 – From FM 989 to Arkansas State Line, widening highway. Reconstructing and widening highway. Eastbound traffic moved to the outside lanes.
- SH 8 – At Sulphur River, replacing bridges.
- SH 93 – Between Kennedy Lane and Meadow Lane, installing sidewalks.
- SH 98 – At Anderson Creek, replacing bridge. All traffic restricted to one lane with signal lights controlling traffic through work zone.
Camp County
- None
Cass County
- SH 8 – At Sulphur River, replacing bridges.
Harrison County
- I-20 – From Gregg County Line to Louisiana State Line, repairing concrete pavement in westbound lanes. Various lane closures.
- US 59 – From one mile south of FM 1997 to FM 1793, installing safety barrier cable. Daily lane closures.
- SH 43 – At Kansas City Southern Railroad in Karnack, widening bridge over railroad. All traffic restricted to one lane with signal lights controlling traffic through work zone.
- FM 1186 – From US 59 to Panola County Line, installing safety end treatments on culverts.
Marion County
- None
Morris County
- SH 49 – From Titus County Line to FM 144, repairing and resurfacing highway.
Panola County
- US 79 – From SH 149 to Rusk County Line, repairing and resurfacing highway.
- US 59 (NE Loop) – From US 59 North to US 79 East, repairing and resurfacing highway. On and off ramps at US 59 and NE Loop closed, traffic detoured accordingly.
- SH 315 – From West Loop in Carthage to Rusk County Line, installing safety end treatments on culverts.
Titus County
- SH 49 – From FM 1735 to Morris County Line, repairing and resurfacing highway.
Upshur County
- None
Editor’s note: This is a schedule of work being planned for the dates noted above. Weather conditions and unforeseen problems can cause delays or cancelation of work. For more information about construction projects, contact Marcus Sandifer, Public Information Officer, TxDOT Atlanta District, 903-799-1306,marcus.sandifer@txdot.gov.