Bowie County
- I-30 – From FM 989 to AR State Line, reconstructing and widening highway, concrete paving in median
- I-30 – Westbound at Exit 207/Spur 594, ramp rehabilitation. Exit & entrance ramps closed. Westbound lanes restricted to one lane
- I-30 – Eastbound from FM 990, drainage upgrades. Traffic limited to one lane in some areas
- SH 8 – At Sulphur River, replacing bridges
- SH 98 – At Anderson Creek, bridge replacement. Traffic restricted to one lane with signal lights controlling traffic through work zone
Camp County
- SL 255 – From FM 1520 to US 271, constructing highway, County Road 2120 detoured
Cass County
- SH 8 – At Sulphur River, replacing bridges
- US 67 – Widening bridge at Jennings Slough, signal lights controlling one-way traffic
Harrison County
- I-20 – At US 59 overpass, replacing bridge. US 59 traffic shifted to southbound lanes
- I-20 – Concrete pavement repairs. Daytime lane closures
- I-20 – At Lansing Switch Road, constructing new bridge over interstate. Lansing Switch Road closed to through traffic. Possible lane closures on I-20
- SH 43 – At Kansas City Southern Railroad in Karnack, widening bridge over railroad. Signal lights controlling one-way traffic
- US 80 – From Loop 390 to Interstate 20, resurfacing highway. Daytime lane closures
- CR 2116 – At Haggerty Creek, replacing bridge. Bridge closed to through traffic
- Cider Lane, Hallsville – From US 80 to Cal Young Road, constructing pedestrian ramps & shared use path. Daytime lane closures
Marion County
- CR 3306 – At Mill Creek, replacing bridge, bridge closed to through traffic
Panola County
- US 59 (Loop) – From Business 59 North of Carthage to US 79 East, rehabilitating highway. US 79 traffic shifted to SB lanes at US 59 Loop. US 59 Loop NB exit ramp closed
- CR 224 – At Irons Bayou, replacing bridge. Bridge closed to through traffic
- US 59 – From Harrison County line to Loop 149, installing safety barrier cable. Daily lane closures
- US 59 – From FM 999 to Shelby County line. Resurfacing road
- FM 1970 – From SH 315 to FM 2260. Resurfacing road
- FM 1251 – From FM 124 to Rusk County line. Resurfacing road
Titus County
- SH 49 – From Business 271 to Mount Pleasant city limits, repairing and resurfacing highway, one-lane, two-way traffic
- US 271 – At Dickson Creek, Big Slough Creek, White Oak Creek & White Oak Creek Relief, replacing bridges
Upshur County
- US 271 – From 5.9 miles north of SH 155 to 1.5 miles north of SH 155, resurfacing road, traffic shifted to southbound lanes
- US 259 – From Meddlin Creek to .5 miles south of FM 450, resurfacing road
Editor’s note: This is a schedule of work being planned for the dates noted above. Weather conditions and unforeseen problems can cause delays or cancelation of work. For more information about construction projects, contact Heather Deaton, Public Information Officer, TxDOT Atlanta District, 903-799-1306,Heather.Deaton@TxDot.gov
Heather Deaton
Public Information Officer – Atlanta District
Office: (903) 799-1306 | Cell: (903) 279-4419
Texas Department of Transportation
701 E. Main St., Atlanta, TX. 75551